---
title: "Peninsula Energy Lance Project cyberincident"
description: "Peninsula Energy says a cybersecurity incident at its Wyoming Lance Project will temporarily affect operations."
incident_type: "Cybersecurity incident"
status: "active"
last_modified: "2026-11-23"
canonical_url: "https://www.ally.security/incidents/peninsula-energy-lance-project-cyberincident-2026"
markdown_url: "https://www.ally.security/incidents/peninsula-energy-lance-project-cyberincident-2026.md"
stix_url: "https://www.ally.security/incidents/peninsula-energy-lance-project-cyberincident-2026/stix.json"
---

# Peninsula Energy Lance Project cyberincident

A November 20 incident at the Lance uranium project prompted a trading halt while Peninsula assessed its effects.

Last modified Nov 23, 2026 · 1 source

## Summary

- **Environment:** Lance uranium project, Wyoming, United States
- **Operational impact:** Temporary operational effects reported; duration and scale remain under assessment.
- **Financial impact:** No verified financial-loss total has been disclosed.

## What happened

[Peninsula Energy](https://www.pel.net.au/) disclosed an incident at its Lance Project in a [November 23 trading-halt request](https://news.finclear.tradecentre.io/asx/document/20261123/03164951.pdf). The company dated the event to late November 20, Australian Western Standard Time, and said operations would be temporarily affected. [1](#source-1)

## Impact

The company was still assessing the duration and impact. Its filing does not quantify production losses or establish data theft. [1](#source-1)

## Timeline

### November 20, 2026 — Lance Project incident

The company uses Australian Western Standard Time for this date. [1](#source-1)

### November 23, 2026 — Trading halted

[ASX’s notice and the company request](https://news.finclear.tradecentre.io/asx/document/20261123/03164951.pdf) describe a halt pending an announcement, or normal trading on November 25 if earlier. [1](#source-1)

### November 23, 2026 — Briefing updated

This briefing was last reviewed and updated on November 23, 2026.

## Threat Group & Attack Vector

Peninsula described a breach of its “operating system” and said administrative systems in the United States and Australia were unaffected. It did not identify the technology or entry route. [1](#source-1)

### Actors

- No threat actor group has been identified in the reviewed public evidence.

### TTPs

- No specific MITRE ATT\&CK technique is currently mapped for this case.

## Response

A preliminary investigation was underway. The trading-halt end condition is separate from recovery of project operations; no completed restoration was reported. [1](#source-1)

## Assets

[Download the case-scoped STIX 2.1 bundle](<https://www.ally.security/incidents/peninsula-energy-lance-project-cyberincident-2026/stix.json>)

## Sources

Primary source records used to research this incident.

<a id="source-1"></a>

### Peninsula Energy Limited — Trading Halt and Trading Halt Request

regulatory · ASX / Peninsula Energy Limited · Nov 23, 2026

<https://news.finclear.tradecentre.io/asx/document/20261123/03164951.pdf>

<details>
<summary>Evidence ledger</summary>

Review the supporting structured claims.

1. **Resulted In · 100% confidence · current**  
   Peninsula Energy Lance Project cyberincident: Peninsula described a breach of its operating system only and said its administrative systems in the United States and Australia were not breached. The filing does not identify the affected technology.
2. **Occurred At · 100% confidence · current**  
   Peninsula Energy Lance Project cyberincident: 2026-11-20
3. **Affected Organization · 100% confidence · current**  
   Peninsula Energy Lance Project cyberincident: Peninsula Energy Limited
4. **Resulted In · 100% confidence · current**  
   Peninsula Energy Lance Project cyberincident: Lance Project incident occurs
5. **Resulted In · 100% confidence · current**  
   Peninsula Energy Lance Project cyberincident: The company said the incident would temporarily affect operations while it conducted a preliminary investigation and assessed timing and impact.
6. **Resulted In · 100% confidence · current**  
   Peninsula Energy Lance Project cyberincident: ASX halted trading on November 23 at the company’s request, pending an announcement, with the halt scheduled until the earlier of normal trading on November 25 or the announcement. This is not a recovery deadline.
7. **Resulted In · 100% confidence · current**  
   Peninsula Energy Lance Project cyberincident: Peninsula reported a cybersecurity incident at its Lance uranium project in Wyoming late on November 20, Australian Western Standard Time.
8. **Occurred At · 100% confidence · current**  
   Lance Project incident occurs: 2026-11-20
9. **Occurred At · 100% confidence · current**  
   Company discloses incident and ASX halts trading: 2026-11-23
10. **Resulted In · 100% confidence · current**  
   Peninsula Energy Lance Project cyberincident: Company discloses incident and ASX halts trading

</details>
