CoreWeave November 26 GPU cooling outage

Cooling and power were restored in controlled batches; some individual node or capacity issues remained after service recovery.

Last modified

Summary

  • Environment: Liquid-cooled GPU nodes in one US-EAST-15A data hall
  • Operational impact: Affected GPU capacity unavailable; services recovered with individual residual issues
  • Financial impact: No incident cost quantified
  • Record status: Developing record. Reviewed November 27, 2026; updated as evidence emerges.

What happened

CoreWeave reported a cooling problem affecting liquid-cooled GPU nodes in one US-EAST-15A data hall at 13:29 UTC on November 26, 2026. [1]

Impact

GPU nodes in the affected hall remained unavailable while the cooling system was inspected and equipment was restored in stages. [1]

At 04:11 UTC on November 27, CoreWeave said the cooling-related disruption was resolved and GPU services in the hall were operational, while individual node or capacity issues still required customer support. [1]

Timeline

  1. Cooling disruption reported

    The initial public update was posted at 13:29 UTC; recovery in controlled batches was underway by 23:16 UTC.

    [1]
  2. GPU services operational

    The 04:11 UTC update reported service recovery, with remaining individual node or capacity issues handled directly. The official notice sets out the findings and response.

    [1]
  3. Briefing updated

    This briefing was last reviewed and updated on November 27, 2026.

Threat Group & Attack Vector

The provider identified a cooling-system problem; the notice does not establish malicious activity or explain the underlying equipment fault. [1]

Actors

  • No attacker involvement is established in the provider’s outage notice.

TTPs

  • No specific MITRE ATT&CK technique is currently mapped for this case.

Response

CoreWeave and its vendors inspected the cooling system, restored power and cooling in controlled batches and verified temperature stability before bringing more equipment online. [1]